Light at the end of the tunnel!!!!
Cage left to do:
Pass side Taco gussets
Seat Back Bracing
Right Side Net Mounts
Window net lower mount
Kill Switch Bracket
Fire System Pull Switch Bracket
De-Spatter all weld joints for paint prep
Harness guides
Reinstall Drivers Glass & mechanism
Finish Lateral Bar pads (Boxing them in)
Paint Dash Cage Tubes and Area
Reinstall HVAC & Dash
Non Cage left to do:
hook up tach and shift light
Steering Column Reinstall
fire system install (Lines are getting flared for AN fittings)
paint interior & cage
exhaust
New Hub Knuckle install
Seelig Parts install (mainly plug wires and MSD Coil pack... Ultra cool windage tray/crank scraper's going to wait for a while)
Rear View Mirror(s)
alignment
new paint/graphics scheme
brake & WOT indicators for video
Preload new front wheel bearings
Mount brake ducts
Grease Tie Rod Ends